Western Disposal

 

33,000 square foot campus including:

            Office Buildings

            Vehicle Maintenance Building

            Recycling Building

Vehicle Discharge and Loader push walls feeding compactor and transports systems included relocation and reconstruction of prefabricated metal buildings, steel joist concrete deck on reinforced architectural concrete block, High Load Resistive steel retaining walls and high performance abrasion resistant concrete slabs supporting heavy machinery. 4.2 million dollar construction cost, completed in 1987.