Rock Bottom Brewery

                                                                                                                                   Westminster

(click on the thumbnail pictures for an enlarged image)

   

    The Rock Bottom Brewery in Westminster was finished in November of 2000.  The project is located next to the AMC Promenade 24 in Westminster.  Steel was used to create both the structure and the roof of this project.  Piers were used for support to combat the expansive soil properties in the area.  The construction cost 800,000 dollars and took 10 months to complete.     

   

Rock Bottom Breweries Gebau has engineered:

                Denver, Colorado                                            Milwaukee, Wisconsin

                Westminster, Colorado                                    Atlanta, Georgia

                Littleton, Colorado                                          Des Moines, Iowa

                Portland, Oregon                                             Dallas, Texas

                Seattle, Washington                                        Cleveland, Ohio

                Bellevue, Washington                                      Cincinnati, Ohio

                San Jose, California                                         Chicago, Illinois

                Kansas City, Kansas                                          Warren Ville, Illinois

                Memphis, Tennessee                                        Ahwatukee, Arizona

                Houston, Texas 

       

Rock Bottom Breweries Gebau has participated in the conceptual design:

                Washington D.C.                                                Indianapolis, Indiana

                Bethesda, Maryland                                            Philadelphia, Pennsylvania

                San Diego, California                                          Evanston, Illinois

 

Rock Bottom Brewery   (Denver)

-12,000 square foot restaurant, tenant finish including the addition of a 600 square foot steel joist and concrete deck mezzanine, brew house and fermentation room and review of the existing structure for an additional 30 tons of structure and equipment loads.  Construction in 1991 with estimated 1.6 million dollar cost.

                                

back to restaurants 